Evergreen Legacy Fund

Administered by Greater DEED – Dedicated to preserving the Legacy of Greater Evergreen

Curb to Curb Paving Finally in Downtown Evergreen! September 24, 2018

Filed under: Press — Greater DEED @ 3:29 pm
Tags: , , ,

IMG_4966

Huge shout out to the good people at CDOT for a beautiful pave job on Evergreen Main Street. Not only were the travel lanes milled and overlayed, so, too, the paving extends from curb to curb.

As unincorporated Jeffco, our hamlet’s county road and state highway maintenance are dictated by rural design standards. Those rural guidelines only provide for paving maintenance of the the travel lanes themselves, not parking lanes to the curb.

On behalf of the board of the Downtown Evergreen Economic District (DEED), we say thank you to the great folks at CDOT, especially Steve Harelson who, for years worked with Dean Dalvit, DEED, to get curb-to-curb paving on this round of milling and overlay, despite the rural design standards. Special thanks, too, to Bill at CDOT’s Kittredge shop for the boots on the ground making it happen.

CDOT’s scheduling motivation for the milling and overlay downtown was the result of maintenance funds finally allocated after schedule delays in 2015, 2016 and 2017. Was the national bike race a catalyst to the schedule? Yes, by 4 days. CDOT moved their schedule up four days so that we’d look great and provide a safer surface for the riders and spectators.

We are grateful for their ‘above the call of duty’ curb-to-curb treatment of Main Street. We are grateful for the countless hours spent in meetings with us and appreciate the great relationship DEED has with the committed, hard working men and women at CDOT that support our ability to drive, park, shop, walk and bike pleasurably and safely around our beautiful town.

Image-57

Image-58

Advertisements